Versa-Floor™ Long-Span Composite Systems

Build

MEP Integration

Electrical and plumbing pass-throughs

Versa-Floor™ systems excel at MEP integration, saving you time and money during this critical building phase. By using a design-assist process early in the project, the pass-throughs are predetermined. Before the concrete pour, all floor openings are framed with a gauge metal pour stop. With this method, there is no need to go back to determine pass-through placement and cut holes through the cured slab.

Deep-Dek® Composite MEP integration
  • Plenum spaces create chase-ways
  • Cost-effective solution for MEP concealment
  • MEP pass-through and optional acoustical treatments
  • Plenum spaces in Deep-Dek ceiling
Versa-Dek® Composite
  • Dovetail design accommodates Versa-Wedge® hanger system
  • Versa-Wedge hanger system for MEP
Versa-Wedge® Hanger System
  • Integrates with Versa-Dek® dovetail design
  • Accommodates threaded rod hangers for MEP components
  • Static load capacities
  • 20 GA: up to 500 lbs.
  • 18 GA: up to 650 lbs.
  • 16 GA: up to 800 lbs.
  • Quick to install, easy to remove and relocate